Stevensville Water Treatment Plant Upgrade
Location Stevensville, MD
Client K. Hovnanian Homes
Size 1.0 MGD
Date of Completion 2023
Services #Construction Services #Water / Wastewater Engineering
Sectors #Community Development #Government #Infrastructure #Water Systems
George, Miles & Buhr, LLC (GMB) was contracted by K. Hovnanian Homes for the design of the Stevensville Water Treatment Plant and Well Project, which involves the construction of a new water treatment plant on an existing water treatment facility site.
Improvements made include a new Water Treatment Plant Building, a Waste Pump Station, a New Lower Patapsco Production Well, Iron and Manganese Removal Equipment utilizing Plate Settlers and Ultrafiltration Membrane Technologies, and all associated chemical feed, electrical, control, and site work/stormwater management improvements necessary for the integration of the new facility on the existing site.
The new facility is capable of net production rates of 1.0 MGD, with an expandable capacity to 2.0 MGD without interruption of the plant’s current operation capacity.